Drilling and piling rigs
Topic
Rotary and percussion drills and pilots build the deep foundations (drilled piles, scroll piles, screen walls) that transmit the building's structural loads to resistant subsoil layers. The physical model integrates the geotechnics of the bearing capacity of the piles and the hydraulic mechanics of the drilling machines. The permissible load of a pile has two components: the tip load (soil resistance or rock at the tip of the pile) and the load of the shaft (adhesion between the pile shaft and the ground along its length). The tip load depends on the unitary resistance of the soil under the tip (which is determined by in situ tests such as the SPT or the CPT) and the area of the pile section. The load of the shaft is the sum of the unitary adhesions in each soil stratum multiplied by the perimeter and the length of the pile in that stratum; This component is usually the predominant one in long piles in coherent soils. The typical safety factor for the total load is 2.5-3 for instrumented and tested piles. The penetration force of the drilling machine is the hydraulic pressure by the area of the cylinder; The torque of the drilling machine is the power of the motor divided by the angular speed of the bar. The pressure necessary to inject the drilling sludge (bentonite or polymer) that stabilizes the walls of the hole and extracts the debris follows the Hagen-Poiseuille equation: the pressure grows linearly with the drilling depth and flow. The static load test of the pile is the definitive verification of the bearing capacity: a load of 1.5-2.5 times the allowable design load is applied and the settlement is measured; If the settlement does not exceed the established limit, the pile is accepted. The expected behavior is that the bearing capacity of the pile grows significantly when reaching a resistant soil layer (dense sand, gravel, rock): the tip resistance can increase by a factor of 10-100 when passing through the transition from soft clay to sand dense.
ID:3713